1
2
3
4
5
6



Parking before
The existing parking area was damaged by a previous storm and thus, left the homeowner with no covered parking on top of broken concrete.
Parking after
The new car port takes up half the space and allows compact, tandem parking. The large opening at right allows whoever parks first to exit through the alley without disturbing the other vehicle.
Garage/back yard
Creating a tandem parking area allowed for a larger yard space, behind the fence at left.
Fence
The main back yard area is surrounded by an 8' modern wood fence that opens up as it moves down the side the house.
A modern back yard in contrast to the city's garden district; this back yard is a private outdoor oasis with a water feature, outdoor seating area, grill area, a hot tub, and multi-level decks.